Owen Roberts International Airport Runway Rehabilitation and Upgrades

A runway extension, new apron, and partial parallel taxiway, will increase safety and efficiency in Grand Cayman

  • $50M

    Construction Value

  • 875

    Foot Extension of Existing Runway

  • 17.5

    CY of Doweled Concrete Pavement

  • Grand Cayman, Cayman Islands

    Grand Cayman, Cayman Islands

Our detailed design helped to improve the safety and efficiency of the airport as travel ramps up

The Cayman Islands are a popular tourist destination. With post-pandemic tourism expected to increase activity at its Owen Roberts International Airport (ORIA) airport, the Cayman Islands Airport Authority retained our expertise to complete a detailed design, and provide construction administration services, to facilitate needed airfield improvements.

Our work included designing a runway extension, new apron, and partial parallel taxiway. These improvements will make the airfield more efficient, while improving safety at the same time. The existing runway was extended by 875-feet, and the terminal apron was expanded to accommodate parking two code E or four code C sized aircraft. A partial parallel taxiway and new perimeter road were constructed, ground lighting for the runway was also upgraded to LED. Due to the hot, breezy climate, special attention was paid to the concrete curing process to reduce shrinkage cracks.

The airport’s topography is low lying, and parts of the airport flood frequently. Existing ponds along the proposed runway extension were filled with structural stone to support the extension. In other areas of flooding, underground detention systems were installed, along with drainage deep-wells to dissipate the water.

In lieu of construction to be completed during scheduled nightly closures, airport restrictions due to COVID-19 allowed the contractor to work more or less unencumbered, allowing for more efficient project phasing, which benefited construction operations as well as the overall final product.

Meet Our Team

Leigh Bartlett, Principal, Transportation

Stantec is like my interests: diverse. My work brings me into contact with wide-ranging expertise–the key to making it all work is communication and flexibility.

Michael Claypoole, Senior Electrical Engineer

To keep pace with changing technology, an engineer needs to supplement education and experience with the ability to assemble reliable resources.
Michael Claypoole Senior Electrical Engineer Read More

Dave Dargie, Vice President, Aviation Engineering Manager

It’s my job to collaborate with owners and operators to design safe and efficient airports to enhance our air travel experience.
Dave Dargie Vice President, Aviation Engineering Manager Read More

Leigh Bartlett

Principal, Transportation

Michael Claypoole

Senior Electrical Engineer

Dave Dargie

Vice President, Aviation Engineering Manager

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top
Run Modes: s7connect,crx3,nosamplecontent,publish,crx3tar
Build Version: 2.5.0.8
Build Date: 2022-44-28 08:44:26