Skip to main content
Start of main content

Elthorne Park High School

Increasing student capacity

  • 4.5K

    Square Metres

  • £12M

    Construction Value

  • London, United Kingdom

    London, United Kingdom

Using collaboration technology (such as building information modelling, or BIM) can reduce costs and shorten project timelines

Elthorne Park High School’s mission is to achieve excellence in a learning community, and to support students and student learning, they wanted a new supplementary building. As the lead engineering consultant, we were responsible for developing the scheme and facilitating an effective transmission from planning stages through to construction.

The scheme faced a number of time constraints given the schools current oversubscription—as such, the design team engaged the use of building information modeling (BIM) software to assist in detailed co-ordination and find time and cost savings. Our team completed monitoring and evaluation as well as architectural, civil, and structural coordination services. Plus, with the exchange of BIM models, we enabled the use of off-site construction techniques which helped Balfour Beatty identify additional programme savings.

More than a construction tool, the BIM model helped the client visualise internal spaces through 3D renders and walkthroughs and became a powerful communication tool with stakeholders. The scheme was designed to achieve a BREEAM New Construction 2014 Very Good rating with a focus on the delivery of low carbon building services and addressing external acoustic parameters while maintaining an internal environment.

At a Glance

Offices
Client
  • Balfour Beatty
Architect of Record
Re-Format Architects
Image Credit
Re-Format Architects

We're better together

  • Become a client

    Partner with us today to change how tomorrow looks. You’re exactly what’s needed to help us make it happen in your community.

    Contact Us
  • Design your career

    Work with passionate people who are experts in their field. Our teams love what they do and are driven by how their work makes an impact on the communities they serve.

    Join the Team
End of main content
To top
Run Modes: s7connect,crx3,nosamplecontent,publish,crx3tar
Build Version: 2.5.0.8
Build Date: 2022-43-28 08:43:59